The date of submission of bids for 5,000 MW inter-state transmission system (ISTS)-based solar projects (2000 MW and 3000 MW capacity) under the Solar Energy Corporation of India (SECI) is likely to be extended by a couple of weeks

The date of submission of bids for 5,000 MW inter-state transmission system (ISTS)-based solar projects (2000 MW and 3000 MW capacity) under the Solar Energy Corporation of India (SECI) is likely to be extended by a couple of weeks. A pre-bid meeting decided to issue revised tender documents. The last date for submission of bids for 2,000 MW (8×250 MW) was May 25, while that for 3000 MW (12×250 MW) was June 5

According to people present at the meeting, developers wanted the maximum size of solar plant per bid to be enhanced to 300 MW from 250 MW offered in the tender. The SECI, with consent of the Ministry of Power, has identified substations of around 36,000 MW capacity across the country that may be considered for substation-based bidding under the ISTS. However, bidders who want to independently connect their substations to nearest central transmission utility (CTU), would be free to do so, they noted

Under ISTS, a developer has to provide connection from the plant to the substation and the nearest CTU. Developers think there is already a lot of load on the CTU from the existing plants – both thermal and renewable – and it would be difficult to get 25-year-long term open access from it. So, it would be suitable if the government takes the responsibility of the CTU connection, the people quoted above said

Some of the major developers who participated at the pre-bid meeting were Sembcorp, Mahindra-Susten, Enel Green Power and Hero Future Energies. The ISTS-based bidding is unique in the sense that it is a must for developers to build the transmission lines to the nearest PGCIL grid network from the project site of its choice. The request for proposal for 2,000 MW plus 3,000 MW solar project under ISTS was initially invited by the SECI in January and February, but the pre-bid meeting was rescheduled several times

NTPC floated a tender for about 2,000 MW solar project under the scheme, but the process too has got delayed. Under the scheme, the ceiling for tariff is set at Rs 2.93/kWh, and developers will have to bid below this price point

The project will have to be commissioned within 15 months of signing of power purchase agreement and if commissioning is delayed beyond two years since signing of PPA, the capacity would get reduced to the current level and the balance capacity will be terminated

However, if the project gets commissioned before the scheduled commissioning date, the SECI will purchase the entire generation at PPA tariff

| Updated on: 24 - May - 2018
Search Tenders By Product: Solar Power Project
To view this paid Project you can either "Buy this Project" or subscribe our annual Project Alert Service and get access to all similar Projects. If you are registered member, please fill in the subscription form below . If not, please Register first.
Step 1 - Select a plan
Select Plan Unit Rate Subscription Validity
Rs. 29500 /-
Step 2 - If registered user, please fill below form
(*) Mandatory fields
Email Id *
States Interested In
Projects Interested In
Select Payment Type
Verification Code *
Note : As Goods and Services Tax is set to be implemented from 1st July 2017. The transition provisions under GST law applies to all services provided by e-Procurement Technologies Limited to its clients on or after 1st July 2017 and GST tax rate and other taxes are applicable as extra for all services provided.